| | |
| | |
| | |
|
| Project and Designer Information: | |
| Region: | Eastern North Carolina |
| School Information:
Property (DSP) No: |
810 Student Middle/High School
650-4249 |
| Architect: | LS3P Associates 5511 Capitol Ctr Dr, Raleigh, NC 27606-3393 Phone: 919-851-9393 FAX: 919-851-1336 Email: [email protected] Web Site: http://www.boneyarch.com |
| Other Recent Prototype Locations: |
| Times Prototype has been Constructed : 1 |
| Construction Costs & Building Area: (Does not include, land, legal, design fees, testing or furnishings) |
|
| Date Bids Received: | 7/22/1999 |
| Construction Bid Cost: | $45,223,219.00 |
| Architectural Building Area: | 397170sq.ft. |
| Assignable Area | 247440sq.ft. |
| Assignable To Total Architectural Area Efficiency | 62.30% |
| Cost per Assignable Square Foot | $182.76 |
| Cost per Total Architectural Square Foot | $113.86 |
| Cost per Student | $20,279.47 |
| Special Features: | |
| Total Building Footprint (total all floors) Area | 110193sq.ft. |
| Site Acreage: | 0 |
| Construction Information: | |
| Building Code Construction Type: | Type II |
| Construction Description: | Steel Frame |
| Roof: | Built-up roofing |
| Number of Floors: | 2 |
| Number of Separate Buildings: | 1 |
| Heating Fuel: | Oil |
| Heating & Air Conditioning: | 4-pipe boiler/chiller |
| Technology Infrastructure: | 8 drops per classroom |
| Design Consultants: | |
| Civil: | Andrew & Kuske Wilmington, NC |
| Structural: | Morrison Engineers Raleigh NC |
| Electrical: | Dewberry & Davis Raleigh NC |
| Plumbing/Mechanical: | Cheatham & Associates Wilmington NC |
| Designer and Owner Comments: |
| Designer Comments: The Middle and High Schools are under one roof with a shared auditorium in the middle. Architectural areas and costs are for the total project (both schools). |
| Owner Comments: |
Check to see if this school has its own Web Site? Click Here.
| | |
| | |
| | |
|