| | |
| | |
| | |
|
| Project and Designer Information: | |
| Region: | Western North Carolina |
| School Information:
Property (DSP) No: |
600 Student Intermediate School
560-4672 |
| Architect: | Bowers Ellis & Watson, PA 168 Patton Ave, Asheville, NC 28801 Phone: 828-236-9992 FAX: 828-236-9996 Email: [email protected] Web Site: http://www.bearch.com |
| Other Recent Prototype Locations: |
| Times Prototype has been Constructed : 1 |
| Construction Costs & Building Area: (Does not include, land, legal, design fees, testing or furnishings) |
|
| Date Bids Received: | 3/7/2008 |
| Construction Bid Cost: | $14,622,600.00 |
| Architectural Building Area: | 91700sq.ft. |
| Assignable Area | 62796sq.ft. |
| Assignable To Total Architectural Area Efficiency | 68.48% |
| Cost per Assignable Square Foot | $232.86 |
| Cost per Total Architectural Square Foot | $159.46 |
| Cost per Student | $24,371.00 |
| Total Building Footprint (total all floors) Area | 91700sq.ft. |
| Site Acreage: | 29 |
| Construction Information: | |
| Building Code Construction Type: | - |
| Construction Description: | Brick venner, CMU walls, slab-on-grade |
| Roof: | Steel frame |
| Number of Floors: | 1 |
| Number of Separate Buildings: | 1 |
| Heating Fuel: | Geothermal |
| Heating & Air Conditioning: | Geothermal heat pump |
| Technology Infrastructure: | CAT 6 |
| Design Consultants: | |
| Civil: | Civil Design Concepts PA Waynesville NC 28786 |
| Structural: | McDonald Structural Engineering Marshall NC 28753 |
| Electrical: | Reece Noland & McElrath Waynesville NC 28786 |
| Plumbing/Mechanical: | Reece Noland & McElrath Waynesville NC 28786 |
| Other Consultant: | Foodesign Associates Charlotte NC 28227 |
| Designer and Owner Comments: |
| Designer Comments: The Intermediate School is a 90,000 SF load-bearing CMU structure with a brick veneer and metal roof. The school's design uses three cross corridors, offering a line of sight of the entire building from just two locations. The school also houses a 10,000 SF gymnasium with performing platform, a cafeteria and kitchen, a state-of-the-art media center with broadcaster studio, and administration area. To increase the efficiency of the school a 90 well geothermal heat pump system was installed, along with tankless hot water heaters, motion sensors in classrooms to control lights and other green design methods to increase performance of the building and minimize cost of upkeep. |
| Owner Comments: |
Check to see if this school has its own Web Site? Click Here.
| | |
| | |
| | |
|