| | |
| | |
| | |
|
| Project and Designer Information: | |
| Region: | Eastern North Carolina |
| School Information:
Property (DSP) No: |
914 Student Elementary School
980-4604 |
| Architect: | Skinner Lamm & Highsmith, PA PO Box 669, Wilson, NC 27894-0669 Phone: 252-291-4127 FAX: 252-291-1070 Email: [email protected] Web Site: http://slharch.com |
| Other Recent Prototype Locations: |
| Times Prototype has been Constructed : 1 |
| Construction Costs & Building Area: (Does not include, land, legal, design fees, testing or furnishings) |
|
| Date Bids Received: | 8/14/2007 |
| Construction Bid Cost: | $15,460,900.00 |
| Architectural Building Area: | 101050sq.ft. |
| Assignable Area | 73760sq.ft. |
| Assignable To Total Architectural Area Efficiency | 72.99% |
| Cost per Assignable Square Foot | $209.61 |
| Cost per Total Architectural Square Foot | $153.00 |
| Cost per Student | $16,915.65 |
| Total Building Footprint (total all floors) Area | 101050sq.ft. |
| Site Acreage: | 74 |
| Construction Information: | |
| Building Code Construction Type: | Type II-B |
| Construction Description: | Steel Frame, masonry shear walls |
| Roof: | Standing Seam Metal |
| Number of Floors: | 1 |
| Number of Separate Buildings: | 1 |
| Heating Fuel: | Oil |
| Heating & Air Conditioning: | Chiller & Fan Coil Units |
| Technology Infrastructure: | CAT 6 |
| Design Consultants: | |
| Civil: | Bartlett Engineering & Surveying, PC Wilson , NC 27893 |
| Structural: | Gardner & McDaniel, PA Durham NC 27717 |
| Electrical: | Progressive Design Collaborative, Ltd Raleigh NC 27661 |
| Plumbing/Mechanical: | Progressive Design Collaborative, Ltd Raleigh NC 27661 |
| Designer and Owner Comments: |
| Designer Comments: Site includes area for future middle school |
| Owner Comments: |
Check to see if this school has its own Web Site? Click Here.
| | |
| | |
| | |
|