| | |
| | |
| | |
|
| Project and Designer Information: | |
| Region: | Central North Carolina |
| School Information:
Property (DSP) No: |
1345 Student High School
920-4370 |
| Architect: | LS3P Associates 5511 Capitol Ctr Dr STE 105, Raleigh, NC 27606-3393 Phone: 919-851-9393 FAX: 919-851-1336 Email: [email protected] Web Site: http://www.boneyarch.com |
| Other Recent Prototype Locations: |
| Times Prototype has been Constructed : 1 |
| Construction Costs & Building Area: (Does not include, land, legal, design fees, testing or furnishings) |
|
| Date Bids Received: | 3/28/2002 |
| Construction Bid Cost: | $26,998,400.00 |
| Architectural Building Area: | 332470sq.ft. |
| Assignable Area | 192346sq.ft. |
| Assignable To Total Architectural Area Efficiency | 57.80% |
| Cost per Assignable Square Foot | $140.36 |
| Cost per Total Architectural Square Foot | $81.20 |
| Cost per Student | $20,073.16 |
| Total Building Footprint (total all floors) Area | 267800sq.ft. |
| Site Acreage: | 123 |
| Construction Information: | |
| Building Code Construction Type: | I-B |
| Construction Description: | Steel Frame |
| Roof: | Modified Bitumen, High Slope Metal |
| Number of Floors: | 2 |
| Number of Separate Buildings: | 1 |
| Heating Fuel: | Natural Gas |
| Heating & Air Conditioning: | 4-pipe boiler/chiller |
| Technology Infrastructure: | Fiber to CR/8 drops |
| Design Consultants: | |
| Civil: | CLH Design Cary NC |
| Landscape: | CLH Design Cary, NC |
| Structural: | Morrison Engineers Raleigh NC |
| Electrical: | Dewberry & Davis Raleigh NC |
| Plumbing/Mechanical: | Cheatham & Associates Wilmington NC |
| Designer and Owner Comments: |
| Designer Comments: |
| Owner Comments: |
Check to see if this school has its own Web Site? Click Here.
| | |
| | |
| | |
|