| Project and Designer Information: | |
| Region: | Central North Carolina |
| School Information:
Property (DSP) No: |
1500 Student High School
920-4151 |
| Architect: | Cherry Huffman Architects 100 S Harrington St., Raleigh, NC 27603 Phone: 919-821-0805 FAX: 919-821-0720 Email: [email protected] |
| Other Recent Prototype Locations: |
| Times Prototype has been Constructed : 2 |
| Construction Costs & Building Area: (Does not include, land, legal, design fees, testing or furnishings) |
|
| Date Bids Received: | 6/12/1997 |
| Construction Bid Cost: | $25,445,179.00 |
| Architectural Building Area: | 274716sq.ft. |
| Assignable Area | 183913sq.ft. |
| Assignable To Total Architectural Area Efficiency | 66.90% |
| Cost per Assignable Square Foot | $138.35 |
| Cost per Total Architectural Square Foot | $92.62 |
| Cost per Student | $16,963.45 |
| Special Costs Included in Bid | $1,037,215.00 |
| Description of Special Costs: Water line, road widening, fill dirt, sewer intcpt | |
| Special Features: | |
| Site Acreage: | 70 |
| Construction Information: | |
| Building Code Construction Type: | Type II |
| Construction Description: | Steel Frame, Brick/CMU |
| Roof: | Thermo-plastic membrane, low slope |
| Number of Floors: | 3 |
| Number of Separate Buildings: | 1 |
| Heating Fuel: | Natural Gas with Ice Storage |
| Heating & Air Conditioning: | 4-Pipe with Boiler & Chiller |
| Technology Infrastructure: | Fiber with 8 drops per classroom |
| Design Consultants: | |
| Civil: | The John R. McAdams Co. Durham, NC 27713 |
| Landscape: | McNeely Associates, PA Raleigh, NC 27622 |
| Structural: | Lasater Hopkins Chang Raleigh, NC 27605 |
| Electrical: | The Wooten Company Raleigh, NC 27603 |
| Plumbing/Mechanical: | The Wooten Company Raleigh, NC 27603 |
| Other Consultant: | Fanning/Howey Assoc., Inc (Consult Arch) Celina, Ohio 45822 |
| Other Consultant: | Stageworks (Theater) Raleigh, NC |
| Designer and Owner Comments: |
| Designer Comments: The school is organized around a central commons which serves as the dining room and social heart of the school. The administration offices, guidance office, auditorium, media center and gymnasium are entered directly from the commons which facilitates way-finding and allows the commons to serve as lobby for all major events. The main entrance to the academic wing is also from the commons, but the classrooms are separated from the commons by the media center and fire stairs which provide a noise buffer to the activity areas. The vocational classrooms are fully integrated into the three story classroom wings. The science classrooms are located or hinge of the two wings which allow them to be arranged departmentally or in academic houses. |
| Owner Comments: |
Check to see if this school has its own Web Site? Click Here.
| | |
| | |
| | |
|