| | |
| | |
| | |
|
| Project and Designer Information: | |
| Region: | Eastern North Carolina |
| School Information:
Property (DSP) No: |
1000 Student High School
710-4340 |
| Architect: | LS3P Associates 434 Fayetteville St, Suite 1700, Raleigh, NC 27601 Phone: 919-829-2700 FAX: 919-829-2730 Email: [email protected] Web Site: http://www.ls3p.com |
| Other Recent Prototype Locations: |
| Times Prototype has been Constructed : 3 |
| Construction Costs & Building Area: (Does not include, land, legal, design fees, testing or furnishings) |
|
| Date Bids Received: | 7/13/2000 |
| Construction Bid Cost: | $15,500,000.00 |
| Architectural Building Area: | 141797sq.ft. |
| Assignable Area | 96627sq.ft. |
| Assignable To Total Architectural Area Efficiency | 68.14% |
| Cost per Assignable Square Foot | $160.41 |
| Cost per Total Architectural Square Foot | $109.31 |
| Cost per Student | $15,500.00 |
| Total Building Footprint (total all floors) Area | 136713sq.ft. |
| Site Acreage: | 140 |
| Construction Information: | |
| Building Code Construction Type: | II-B |
| Construction Description: | Steel Frame, masonry veneer, CMU backup |
| Roof: | Low Slope BUR |
| Number of Floors: | 2 |
| Number of Separate Buildings: | 1 |
| Heating & Air Conditioning: | 4-pipe boiler/chiller |
| Design Consultants: | |
| Civil: | Norris Kuske & Tunstall Wilmington NC |
| Landscape: | Hayden Stanziale Wilmington NC |
| Structural: | Norris Kuske & Tunstall Wilmington NC |
| Electrical: | Atlantec Raleigh NC 27612 |
| Plumbing/Mechanical: | Cheatham & Associates Wilmington NC |
| Designer and Owner Comments: |
| Designer Comments: |
| Owner Comments: |
Check to see if this school has its own Web Site? Click Here.
| | |
| | |
| | |
|