| | |
| | |
| | |
|
| Project and Designer Information: | |
| Region: | Central North Carolina |
| School Information:
Property (DSP) No: |
585 Student Elementary School
681-4698 |
| Architect: | Moseley Architects 3000 RDU Center Drive Suite 217, Raleigh, NC 27560 Phone: 919-840-0091 FAX: 919-840-0045 Email: [email protected] Web Site: http://www.moseleyarchitects.com |
| Other Recent Prototype Locations: |
| Times Prototype has been Constructed : 1 |
| Construction Costs & Building Area: (Does not include, land, legal, design fees, testing or furnishings) |
|
| Date Bids Received: | 1/31/2012 |
| Construction Bid Cost: | $18,190,368.00 |
| Architectural Building Area: | 99700sq.ft. |
| Assignable Area | 68053sq.ft. |
| Assignable To Total Architectural Area Efficiency | 68.26% |
| Cost per Assignable Square Foot | $267.30 |
| Cost per Total Architectural Square Foot | $182.45 |
| Cost per Student | $31,094.65 |
| Total Building Footprint (total all floors) Area | 99700sq.ft. |
| Site Acreage: | 8 |
| Construction Information: | |
| Building Code Construction Type: | II-B |
| Construction Description: | Steel structure with brick veneer, steel stud backup. Interior steel stud partitions with gypsum wall board finishes. |
| Roof: | Modified BUR / Standing Seam Metal |
| Number of Floors: | 3 |
| Number of Separate Buildings: | 1 |
| Heating Fuel: | Natural Gas |
| Heating & Air Conditioning: | 4 Pipe VAV |
| Design Consultants: | |
| Civil: | Timmons Group Raleigh, NC 27607 |
| Structural: | Stroud, Pence and Associates Raleigh, NC 27609 |
| Electrical: | The Wooten Company Raleigh, NC 27603 |
| Plumbing/Mechanical: | The Wooten Company Raleigh, NC 27603 |
| Designer and Owner Comments: |
| Designer Comments: The Elementary School is a child-centered, welcoming and environmentally sensitive facility that respects and supports the local community. The three-story elementary school will accommodate 585 students and include art, science, and music rooms along with a media center and multipurpose room. In addition, the facility will integrate the districts �policy 9040� for high performance design criteria with certification through the US Green Building Council�s LEED Green Building Rating System. The site design includes parking, service court, bike parking and access, sidewalks, playgrounds, playing field, community garden, bus drop off, and car drop off loop that doubles as hard surface play during the school day with the provided gate system. |
| Owner Comments: |
Check to see if this school has its own Web Site? Click Here.
| | |
| | |
| | |
|