| Project and Designer Information: | |
| Region: | Eastern North Carolina |
| School Information:
Property (DSP) No: |
600 Student Elementary School
650-2674 |
| Architect: | SfL+a Architects 333 Fayetteville Street, Suite 225, Raleigh, NC 27601 Phone: 919.573.6350 FAX: 919.573.6355 Email: [email protected] Web Site: www.sfla.biz |
| Other Recent Prototype Locations: |
| Times Prototype has been Constructed : 1 |
| Construction Costs & Building Area: (Does not include, land, legal, design fees, testing or furnishings) |
|
| Date Bids Received: | 3/19/2009 |
| Construction Bid Cost: | $10,826,915.00 |
| Architectural Building Area: | 89005sq.ft. |
| Assignable Area | 61428sq.ft. |
| Assignable To Total Architectural Area Efficiency | 69.00% |
| Cost per Assignable Square Foot | $176.25 |
| Cost per Total Architectural Square Foot | $121.64 |
| Cost per Student | $18,044.86 |
| Total Building Footprint (total all floors) Area | 89005sq.ft. |
| Site Acreage: | 6 |
| Construction Information: | |
| Building Code Construction Type: | II-B NCBC 2006 |
| Construction Description: | Load bearing masonry w/cavity wall |
| Roof: | Energy star TPO |
| Number of Floors: | 2 |
| Number of Separate Buildings: | 1 |
| Heating Fuel: | Natural Gas |
| Heating & Air Conditioning: | Geotherm Heat Pump |
| Technology Infrastructure: | Conduit & pathways, smartboards |
| Design Consultants: | |
| Civil: | Stewart Engineering Wilmington, NC |
| Structural: | LHC Raleigh, NC |
| Electrical: | MCBH Wilmington, NC |
| Plumbing/Mechanical: | MCBH Wilmington, NC |
| Designer and Owner Comments: |
| Designer Comments: Designed to replace aging existing school that was cherished by the community, the new Snipes Academy of Art & Design captured the magic of the original school and fits the needs of a 21st century elementary magnet school. This facility is LEED Gold Certified. |
| Owner Comments: |
Check to see if this school has its own Web Site? Click Here.
| | |
| | |
| | |
|