750 Student Elementary School



Floor Plan

|


Site Plan

|


Photo-View

|


Project Main Page

Project and Designer Information:
Region: Central North Carolina  
School Information:

Property (DSP) No:
Design Capacity:
Core Capacity:
Grade Organization:

750 Student Elementary School

410-4102
750 Students
950 Students
PK-5

Architect:  Moser Mayer Phoenix Associates PA
230 N. Elm St., STE 1200, Greensboro, NC 27401
Phone: 336 373-9800 FAX: 336 373-0077
Email: [email protected]
Web Site: http://mmpa.com
 
Other Recent Prototype Locations:
Times Prototype has been Constructed :   4
 
Construction Costs & Building Area:
(Does not include, land, legal, design fees, testing or furnishings)
 
Date Bids Received:12/20/1994
Construction Bid Cost:$7,176,089.00
Architectural Building Area: 89432sq.ft.
Assignable Area 62862sq.ft.
Assignable To Total Architectural Area Efficiency 70.30%
Cost per Assignable Square Foot$114.16
Cost per Total Architectural Square Foot$80.24
Cost per Student$9,568.12
Special Costs Included in Bid$0.00
Description of Special Costs: N/A
Total Building Footprint (total all floors) Area 89432sq.ft.
Site Acreage:26
Construction Information:  
Building Code Construction Type:Type IV-Unprotected
Construction Description:Steel Frame with Brick
Roof:High & Low Slope w/ Metal & Mod. Bit.
Number of Floors:1
Number of Separate Buildings:1
Heating Fuel:Natural Gas
Heating & Air Conditioning:4-Pipe with Boiler & Chiller
Technology Infrastructure: 6 drops per classroom
Design Consultants:  
Civil:  Anderson & Associates Greensboro, NC 27410
Landscape:  Sustainable Landscape Design Studios Greensboro, NC 27420
Structural:  Sutton Kennerly & Associates Greensboro, NC 27407
Other Consultant:  Efland Consulting Engineers (Plumbing) Durham, NC 27705
Designer and Owner Comments:
Designer Comments:  The Elementary School incorporates current philosophy in education and a state-of-the-art technology system. Arrangement of classrooms in a series of "houses" provides a creative learning envirorunent with an appropriate scale for children. The school plan adapts to a variety of sites by reconfiguring the "houses" The prototype speeds construction and reduces building costs without sacrificing educational quality. MMPA is has completed construction on a second school of this prototype, and two more are currently under construction, scheduled to be complete next summer. MMPA redesigned the fa�ade and changed the exterior colors so each school has its own character and identifies with its particular community. To assure the long term flexibility of each school, the "houses" have been designed and engineered to be easily expanded as the student population increases.
Owner Comments: The schedule for this project was extremely tough. Design and construction documentation were completed in just 13 weeks, and construction was completed in 14 months. MMPA's depth and project management skills ensured that they met this demanding schedule. Throughout the project, MMPA has been mindful not only of the construction budget, but of long-range maintenance and operating costs as well. They selected materials and finishes that would keep the project within the current budget, yet would be cost-effective throughout the life of the school. Furthermore, they provided design alternatives that allowed us to choose from various options, depending upon the contractor bids. I have found the Moser Mayer Phoenix staff to be completely professional and responsive to our needs. Overall, my experience with Moser Mayer Phoenix Associates has been a positive one.
The plans and designs published herein are the property of the named designer of record. Any use, other than incidental printing for further study, is prohibited without the express written consent of the designer.