| Project and Designer Information: | |
| Region: | Central North Carolina |
| School Information:
Property (DSP) No: |
880 Student Elementary School
340-4718 |
| Architect: | Walter Robbs Callahan & Pierce Architects, PA 530 N Trade Street, Winston Salem, NC 27101 Phone: 336-725-1371 FAX: 335-725-1465 Email: [email protected] Web Site: www.walterrobbs.com |
| Other Recent Prototype Locations: |
| Times Prototype has been Constructed : 1 |
| Construction Costs & Building Area: (Does not include, land, legal, design fees, testing or furnishings) |
|
| Date Bids Received: | 11/24/2009 |
| Construction Bid Cost: | $11,670,039.00 |
| Architectural Building Area: | 96505sq.ft. |
| Assignable Area | 65651sq.ft. |
| Assignable To Total Architectural Area Efficiency | 68.00% |
| Cost per Assignable Square Foot | $177.76 |
| Cost per Total Architectural Square Foot | $120.93 |
| Cost per Student | $13,261.41 |
| Total Building Footprint (total all floors) Area | 62503sq.ft. |
| Site Acreage: | 16 |
| Construction Information: | |
| Building Code Construction Type: | Type IIB |
| Construction Description: | Masonry Bearing Wall |
| Roof: | Single-Ply TPO / Metal |
| Number of Floors: | 2 |
| Number of Separate Buildings: | 1 |
| Heating Fuel: | Gas |
| Heating & Air Conditioning: | Water Source Heat Pump |
| Technology Infrastructure: | Wiremold Raceway w/Cat 5E |
| Design Consultants: | |
| Civil: | Davis Martin Powell High Point, NC 27265. |
| Structural: | SKA Engineers Greensboro, NC 27407 |
| Electrical: | Bill Robinson Engineers Winston Salem NC 27103 |
| Plumbing/Mechanical: | CES Inc Winston Salem NC 27101 |
| Other Consultant: | Foodesign Charlotte, NC |
| Designer and Owner Comments: |
| Designer Comments: This new two-story elementary school facility was built on a 16.5 acre site in Central NC. The school site will become part of a planned, mixed-use, walkable community (to include institutional, commercial, retail and residential buildings). The new elementary school will support 960 students. The facility includes classrooms, administrative offices, media center, stage, basketball court, kitchen, dining and other support spaces. Playground and sport fields are included on site. A stream runs along the southern boundary of the site and will be developed as a pedestrian greenway area which will connect to the greater greenway system of the surrounding community. The school was built with qualified school construction bonds (QSCB). |
| Owner Comments: |
Check to see if this school has its own Web Site? Click Here.
| | |
| | |
| | |
|