| Project and Designer Information: | |
| Region: | Eastern North Carolina |
| School Information:
Property (DSP) No: |
908 Student Elementary/Middle School
070-4258 |
| Architect: | Applegate Architects 404 Pollack Street, New Bern, NC 28560 Phone: 252-633-5603 FAX: 252-633-6793 Web Site: http://www.applegatearchitects.com |
| Other Recent Prototype Locations: |
| Times Prototype has been Constructed : 1 |
| Construction Costs & Building Area: (Does not include, land, legal, design fees, testing or furnishings) |
|
| Date Bids Received: | 2/18/1999 |
| Construction Bid Cost: | $11,038,440.00 |
| Architectural Building Area: | 123374sq.ft. |
| Assignable Area | 90195sq.ft. |
| Assignable To Total Architectural Area Efficiency | 73.10% |
| Cost per Assignable Square Foot | $122.38 |
| Cost per Total Architectural Square Foot | $89.47 |
| Cost per Student | $12,156.87 |
| Total Building Footprint (total all floors) Area | 121856sq.ft. |
| Site Acreage: | 75 |
| Construction Information: | |
| Building Code Construction Type: | Type II |
| Construction Description: | Steel Frame, Brick/CMU |
| Roof: | High Slope Metal |
| Number of Floors: | 1 |
| Number of Separate Buildings: | 1 |
| Heating Fuel: | Propane |
| Heating & Air Conditioning: | 4-Pipe with Boiler & Chiller |
| Technology Infrastructure: | Cat V with 6 drops per classroom |
| Design Consultants: | |
| Landscape: | Jack Daft New Bern, NC 28560 |
| Structural: | NRW Engineering Virginia Beach VA 23464 |
| Electrical: | Pace Collaborative Virginia Beach VA 23462 |
| Plumbing/Mechanical: | Pace Collaborative Virginia Beach, VA 23462 |
| Designer and Owner Comments: |
| Designer Comments: The Elementary School and Middle School is one unified school replacing an existing elementary school and an existing middle school. The design shares core facilities but maintains the separation of elementary and middle school programs. The overall plan for the elementary school and the middle school complex is based upon a central axis, which connects the elementary school and the middle school to the central (core) services. The core area includes kitchen and cafeteria, media center, administration, multi-purpose room and gymnasium. The core area also includes a large portion of the building mechanical systems. The building axis is oriented on an east-west axis in order to provide the optimum solar orientation. There are three roof monitors, which provide daylight to the main corridors. These monitors are located at the central axis of the school and at the cross axis of the elementary school and the middle school. The design is very efficient, resulting in an overall net to gross ratio of 1.45. |
| Owner Comments: |
Check to see if this school has its own Web Site? Click Here.
| | |
| | |
| | |
|