| Project and Designer Information: | |
| Region: | Eastern North Carolina |
| School Information:
Property (DSP) No: |
750 Student High School
070-4165 |
| Architect: | Applegate Architects 404 Pollack St., New Bern, NC 26580 Phone: 252-833-5603 FAX: 252-833-6793 Web Site: http://www.applegatearchitects.com |
| Other Recent Prototype Locations: |
| Times Prototype has been Constructed : 1 |
| Construction Costs & Building Area: (Does not include, land, legal, design fees, testing or furnishings) |
|
| Date Bids Received: | 7/11/1997 |
| Construction Bid Cost: | $17,238,894.00 |
| Architectural Building Area: | 169674sq.ft. |
| Assignable Area | 122914sq.ft. |
| Assignable To Total Architectural Area Efficiency | 72.40% |
| Cost per Assignable Square Foot | $140.25 |
| Cost per Total Architectural Square Foot | $101.60 |
| Cost per Student | $22,985.19 |
| Special Costs Included in Bid | $200,000.00 |
| Description of Special Costs: Site Grading and Fill | |
| Total Building Footprint (total all floors) Area | 169674sq.ft. |
| Site Acreage: | 72 |
| Construction Information: | |
| Building Code Construction Type: | Type II |
| Construction Description: | Steel Frame, Brick/CMU |
| Roof: | High Slope Metal |
| Number of Floors: | 1 |
| Number of Separate Buildings: | 1 |
| Heating Fuel: | Propane |
| Heating & Air Conditioning: | 4-pipe boiler/chiller |
| Technology Infrastructure: | Fiber Backbone w/ 5 Cat V Drops/CR |
| Design Consultants: | |
| Civil: | Steve Janowski New Bern NC |
| Structural: | NRW Engineering Virginia Beach VA 23464 |
| Electrical: | Baker Engineering Durham NC 27705 |
| Plumbing/Mechanical: | Baker Engineering Durham, NC 27705 |
| Designer and Owner Comments: |
| Designer Comments: The High School is a 167,000 square foot facility with an estimated turn key cost of $20 million. The project bid at $15 million which enabled the acceptance of all alternate bid items for a complete project. Features include an all metal architectural grade sloping roof, extra wide corridors for visibility, classrooms, art, music, and band rooms, an 850 seat auditorium and stage, 400 seat cafeteria, and vocational shops. This facility includes a new gymnasium, complete with seahng for 1,600 people, lockers, support offices, auxiliary gym, and weight room. It also includes a 15-acre athletic complex with varsity football and baseball stadiums, athletic track and field apparatus, practice fields, 6,500 square foot field house, and tennis courts. The cabling and communication system at Southside High School Is built around the Tek-Net interactive information retrieval system, allowing classroom connections to all media-located information, including cable TV, DVD, VHS, Channel 1, and distance learning facilities. |
| Owner Comments: |
Check to see if this school has its own Web Site? Click Here.
| | |
| | |
| | |
|