CONSTRUCTION METHODSAND REPORTING REQUIREMENTS
Construction Methods Available: G.S. 143-128(a1)
Separate Prime Bidding
Single Prime Bidding
Construction Management at Risk
Dual Bidding
Alternative Contracting Methods
Why “at risk”?
Construction Management Agency
How does the CM calculate the GMP?
A Key Benefit of CM at Risk
Licensure Requirement
Subcontractor bidding to CM
Prequalification Criteria
Minority Participation
Bonding Requirements
Construction Phase
Selection of the CM
Selection of CM
Selection of CM
Evaluation Committee
Composition of the Evaluation Committee
Selection Documentation
Negotiation of CM Fee
Reporting Requirements G.S. 143-64.31(b)
Reporting fee information
Reporting fee information
Additional Reporting Requirements (Section 13)
Additional Reporting Requirements (Section 13)
When to Use CM at Risk
|