Construction Manager at Risk G.S. 143-128.1
Single point of responsibility
Must be a licensed general contractor
Design is separately contracted
Subcontractors prequalified,competitively bid
CM selects subcontractors; unit can override with compensation to CM for increased cost
Reporting requirements for use of CM at risk